Perfect blue sky day for a crane lift! We’ve been back at Tilbury Docks today to reinstate these seven Daikin VRV units.




The initial decommissioning of the units (electrical isolation; recovery of R410A refrigerant gas; pipework disconnection; crane lift to ground level) took place earlier this month, to enable repairs to the roof to be made. Now that those repairs have been completed, we have been back on site to lift the units back onto the roof, reconnect and commission, and get the client’s air conditioning system back up and running ready for the hot summer ahead (fingers crossed about the hot summer!)